{"id":7471,"date":"2026-05-16T08:36:37","date_gmt":"2026-05-16T08:36:37","guid":{"rendered":"https:\/\/bhergonomic.com\/?p=7471"},"modified":"2026-08-17T09:12:49","modified_gmt":"2026-08-17T09:12:49","slug":"do-office-pods-need-permits","status":"publish","type":"post","link":"https:\/\/bhergonomic.com\/es\/do-office-pods-need-permits\/","title":{"rendered":"Requisitos para la obtenci\u00f3n del permiso de instalaci\u00f3n de m\u00f3dulos de oficina: lo que los compradores estadounidenses deben verificar antes de la instalaci\u00f3n"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Respuesta r\u00e1pida<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para muchas oficinas en EE. UU., una peque\u00f1a cabina independiente con toma de corriente y ruedas puede presentarse para su revisi\u00f3n como mobiliario m\u00f3vil en lugar de como un espacio cerrado. Esto no implica una exenci\u00f3n autom\u00e1tica del permiso. La autoridad local competente (AHJ), el propietario o el administrador del edificio, as\u00ed como cualquier inspector de incendios o el\u00e9ctrico requerido, deciden qu\u00e9 requisitos de permiso se aplican al m\u00f3dulo de oficina en funci\u00f3n del modelo, la ubicaci\u00f3n, la conexi\u00f3n el\u00e9ctrica, los rociadores, las salidas de emergencia, la accesibilidad y las normas locales. Confirma el proceso de revisi\u00f3n antes de realizar el pedido.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00daltima actualizaci\u00f3n: 17 de agosto de 2026 | Autor: Richard | Tiempo estimado de lectura: 8 minutos<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits.png\" alt=\"\u00bfSe necesitan permisos para instalar m\u00f3dulos de oficina? Escala de riesgos de los permisos para m\u00f3dulos de oficina\" class=\"wp-image-7474\" srcset=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits.png 1536w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits-600x400.png 600w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits-300x200.png 300w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits-1024x683.png 1024w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits-768x512.png 768w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/do-office-pods-need-permits-18x12.png 18w\" sizes=\"(max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">\u00bfSe necesitan permisos para instalar m\u00f3dulos de oficina en EE. UU.?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">No existe una respuesta \u00fanica a nivel nacional que sea un simple \u201cs\u00ed\u201d o \u201cno\u201d. Un m\u00f3dulo de oficina para interiores puede clasificarse como mobiliario m\u00f3vil, equipo o una instalaci\u00f3n relacionada con la construcci\u00f3n. La clasificaci\u00f3n depende de lo que se instale, c\u00f3mo se conecte al edificio, d\u00f3nde se ubique y c\u00f3mo interprete el proyecto la autoridad local.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Es m\u00e1s probable que una c\u00e1psula peque\u00f1a se someta a una revisi\u00f3n similar a la de los muebles cuando es independiente, se conecta a la red el\u00e9ctrica, es m\u00f3vil y no altera el edificio. Es m\u00e1s probable que se requiera una revisi\u00f3n cuando el proyecto incluye alimentaci\u00f3n el\u00e9ctrica por cable, anclaje estructural, un techo cerrado de mayor tama\u00f1o, m\u00faltiples m\u00f3dulos, instalaciones de rociadores, modificaciones al sistema de alarma contra incendios, v\u00edas de salida restringidas o impactos en la accesibilidad.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los requisitos locales pueden ser m\u00e1s estrictos de lo que espera un comprador. Por ejemplo, <a href=\"https:\/\/www.sf.gov\/install-privacy-pods-in-an-office\/\" rel=\"noopener\">Pautas oficiales de San Francisco para los espacios privados en interiores<\/a> exige permisos y aborda cuestiones como la ubicaci\u00f3n, la seguridad contra incendios y en casos de emergencia, los rociadores, las alarmas y la accesibilidad. Esos son requisitos de San Francisco, no una norma nacional, pero demuestran por qu\u00e9 es necesaria una decisi\u00f3n local.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por lo tanto, la respuesta pr\u00e1ctica a la pregunta \u201c\u00bfSe necesitan permisos para instalar m\u00f3dulos de oficina?\u201d es la siguiente: documenta la configuraci\u00f3n propuesta, identifica cualquier requisito que requiera revisi\u00f3n y consulta al responsable local correspondiente antes de que sea dif\u00edcil modificar la orden de compra.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cu\u00e1ndo es m\u00e1s probable que un m\u00f3dulo de oficina se considere como mobiliario m\u00f3vil<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Las siguientes caracter\u00edsticas respaldan una propuesta de mobiliario m\u00f3vil:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>La c\u00e1psula es independiente.<\/li>\n\n\n\n<li>No est\u00e1 atornillado al piso, a la pared, al techo ni a la estructura del edificio.<\/li>\n\n\n\n<li>Utiliza alimentaci\u00f3n por enchufe en lugar de una conexi\u00f3n el\u00e9ctrica fija.<\/li>\n\n\n\n<li>Cuenta con ruedas o se puede trasladar sin necesidad de demolici\u00f3n.<\/li>\n\n\n\n<li>No est\u00e1 conectado a los sistemas de climatizaci\u00f3n, rociadores ni de alarma contra incendios del edificio.<\/li>\n\n\n\n<li>Su ubicaci\u00f3n propuesta permite mantener despejadas las salidas, los pasillos, las puertas, el equipo contra incendios y los paneles de acceso.<\/li>\n\n\n\n<li>Los documentos del producto y de instalaci\u00f3n est\u00e1n disponibles para su consulta.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Estas caracter\u00edsticas ayudan a explicar la instalaci\u00f3n; no determinan el resultado. Una c\u00e1psula sobre ruedas a\u00fan puede ser objeto de revisi\u00f3n debido a su tama\u00f1o, altura libre, ubicaci\u00f3n, ocupaci\u00f3n, carga del piso, condiciones de protecci\u00f3n contra incendios o impacto en la circulaci\u00f3n accesible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Una declaraci\u00f3n de env\u00edo \u00fatil es:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Se trata de una cabina de oficina independiente con conexi\u00f3n el\u00e9ctrica, dise\u00f1ada para instalarse como mobiliario m\u00f3vil. No est\u00e1 anclada al edificio y no modifica los sistemas del mismo. Por favor, confirme qu\u00e9 tipo de revisi\u00f3n o permiso, si lo hubiera, se aplica al modelo y la ubicaci\u00f3n propuestos.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Matriz de escalamiento de permisos para m\u00f3dulos de oficina<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Utiliza esta matriz para identificar la primera conversaci\u00f3n de revisi\u00f3n y la informaci\u00f3n que se debe aclarar antes de realizar el pedido. Se trata de una herramienta de planificaci\u00f3n, no de una determinaci\u00f3n de c\u00f3digo local.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Configuraci\u00f3n o activador propuesto<\/th><th>\u00bfPor qu\u00e9 cambian las rese\u00f1as?<\/th><th>Primer revisor con quien contactar<\/th><th>Acci\u00f3n de preventa<\/th><\/tr><\/thead><tbody><tr><td>M\u00f3dulo peque\u00f1o, independiente, enchufable y con ruedas; no requiere cambios en el sistema de construcci\u00f3n<\/td><td>Admite una clasificaci\u00f3n de muebles m\u00f3viles<\/td><td>Administrador de instalaciones, propietario o administrador del edificio<\/td><td>Confirma la ubicaci\u00f3n propuesta y env\u00eda la informaci\u00f3n b\u00e1sica del producto<\/td><\/tr><tr><td>M\u00f3dulo ubicado en una oficina con sistema de rociadores o cerca de un rociador ya instalado<\/td><td>El techo y la ubicaci\u00f3n de la c\u00e1psula pueden influir en la evaluaci\u00f3n de protecci\u00f3n contra incendios<\/td><td>Responsable de seguridad contra incendios en edificios o revisor de sistemas de protecci\u00f3n contra incendios<\/td><td>Env\u00eda la altura del m\u00f3dulo, los detalles del techo y el plano marcado; pregunta si se requiere un rociador interno o una abertura preparada.<\/td><\/tr><tr><td>Una c\u00e1psula m\u00e1s grande para varias personas, varias c\u00e1psulas o una disposici\u00f3n compacta<\/td><td>El tama\u00f1o, la ocupaci\u00f3n, la circulaci\u00f3n, la superficie del techo y los efectos acumulativos de la distribuci\u00f3n aumentan<\/td><td>Administrador del edificio y autoridad competente local (AHJ) o profesional encargado del cumplimiento de los c\u00f3digos del proyecto<\/td><td>Env\u00ede el paquete completo de revisi\u00f3n antes de aprobar el pedido<\/td><\/tr><tr><td>Conexi\u00f3n el\u00e9ctrica fija<\/td><td>El cableado directo del edificio puede requerir permisos el\u00e9ctricos, inspecciones y trabajos realizados por profesionales con licencia.<\/td><td>Electricista con licencia e inspector el\u00e9ctrico local<\/td><td>Confirmar el m\u00e9todo de conexi\u00f3n, la responsabilidad de la autorizaci\u00f3n y la documentaci\u00f3n el\u00e9ctrica requerida<\/td><\/tr><tr><td>Anclaje o conexi\u00f3n a rociadores, sistemas de climatizaci\u00f3n, alarmas o la estructura<\/td><td>El proyecto ahora modifica o depende de los sistemas del edificio<\/td><td>Autoridad competente (AHJ), profesional de dise\u00f1o pertinente y contratista especializado con licencia<\/td><td>Aborda la instalaci\u00f3n como un proyecto coordinado y define el alcance antes de la fabricaci\u00f3n<\/td><\/tr><tr><td>El pod afecta una v\u00eda p\u00fablica, un corredor, una entrada o una v\u00eda de circulaci\u00f3n accesible<\/td><td>La ubicaci\u00f3n puede afectar las condiciones de salida o de accesibilidad<\/td><td>Planificador de instalaciones, arquitecto, revisor de accesibilidad o autoridad competente (AHJ)<\/td><td>Revisa las rutas despejadas, el sentido de apertura de las puertas, el espacio de acceso y el plano completo del piso<\/td><\/tr><tr><td>Heavy pod on a raised floor or a floor with unresolved capacity<\/td><td>Weight and load distribution need site-specific confirmation<\/td><td>Facility manager and the project&#8217;s qualified structural contact<\/td><td>Provide product weight and footprint for the building team&#8217;s review<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">If more than one row applies, use the highest review level. Casters do not cancel a hardwired connection, a sprinkler concern, or a blocked route.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What to Check When the Office Has Sprinklers<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sprinklers are the most common office pod review question B&amp;H Ergonomics receives. The answer should be established for the selected pod and location; it should not be guessed from the product category alone.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask the building or fire-protection reviewer:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Is the office protected by sprinklers, and where are the nearest heads?<\/li>\n\n\n\n<li>Does the proposed pod ceiling or location affect the required coverage?<\/li>\n\n\n\n<li>Is a sprinkler needed inside the pod?<\/li>\n\n\n\n<li>Would the reviewer accept another configuration, such as an approved open-top detail, if available for the model?<\/li>\n\n\n\n<li>What drawings, material information, or fire reports must be submitted?<\/li>\n\n\n\n<li>Who will perform and approve any site sprinkler work?<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">When a project requires it, B&amp;H Ergonomics can prepare selected pod models with a sprinkler provision and a removable dust plug. The plug protects the opening until the provision is put into use, at which point it can be removed. This is a model- and project-specific option. It does not determine whether a sprinkler is required, provide a sprinkler design, or replace approval by the fire-protection contractor and local authority.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Resolve this question before manufacturing. Adding an opening at the correct stage is more controlled than discovering the requirement after the pod arrives.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who Should Review the Pod Before You Order?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Start with the party that controls the building, then bring in technical reviewers when the configuration triggers their scope.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Facility manager, landlord, or building manager:<\/strong> Confirm whether pods are allowed, where they may be placed, and which local review process the building follows.<\/li>\n\n\n\n<li><strong>Fire-safety or fire-protection reviewer:<\/strong> Review sprinkler proximity, the pod ceiling, alarms, fire equipment, and exit paths when those conditions are relevant.<\/li>\n\n\n\n<li><strong>Licensed electrician or electrical reviewer:<\/strong> Review hardwiring, nonstandard connections, or any proposed change to building electrical systems.<\/li>\n\n\n\n<li><strong>Architect, accessibility reviewer, or code consultant:<\/strong> Review routes, clearances, door approaches, occupancy, or a larger multi-pod layout when professional design input is required.<\/li>\n\n\n\n<li><strong>Local AHJ:<\/strong> Confirm the permit or approval path when the building team cannot close the question or local rules require formal review.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">The exact order can vary by jurisdiction and building. The purpose of this sequence is to identify the controlling issue early, not to bypass the AHJ.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-1024x683.png\" alt=\"Lista de verificaci\u00f3n del paquete de presentaci\u00f3n ante la autoridad competente (AHJ) para el m\u00f3dulo de oficina\" class=\"wp-image-7478\" srcset=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-1024x683.png 1024w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-600x400.png 600w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-300x200.png 300w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-768x512.png 768w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist-18x12.png 18w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/05\/office-pod-AHJ-submittal-packet-checklist.png 1536w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What to Include in the Review Packet<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A reviewer needs project information, not a general sales brochure. Prepare one compact packet containing:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Pod model, intended use, quantity, and occupant capacity<\/li>\n\n\n\n<li>Overall dimensions, footprint, height, and weight<\/li>\n\n\n\n<li>Product drawings and door-swing information<\/li>\n\n\n\n<li>Installation and assembly instructions<\/li>\n\n\n\n<li>Plug, voltage, power, and cord-routing information<\/li>\n\n\n\n<li>Confirmation of casters, freestanding installation, and any anchoring<\/li>\n\n\n\n<li>Ventilation description and ventilation-point clearances<\/li>\n\n\n\n<li>Ceiling detail and any available sprinkler-provision option<\/li>\n\n\n\n<li>Available material or fire reports for the selected model or materials<\/li>\n\n\n\n<li>A floor plan marking the proposed pod location, exits, corridors, doors, outlets, sprinklers, alarms, fire equipment, and access panels<\/li>\n\n\n\n<li>Notes on the accessible route and surrounding clearances<\/li>\n\n\n\n<li>The name of the reviewer and a record of the decision or requested changes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">B&amp;H Ergonomics can provide dimensions, weight, installation instructions, product drawings, ventilation information, and available fire documentation for the selected configuration. The buyer or project team supplies the site floor plan and local building information. If a reviewer requests a specific document, confirm that it applies to the exact pod model and configuration rather than relying on a generic certificate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For a broader review of fire safety, accessibility, electrical documentation, and ventilation, use the B&amp;H Ergonomics <a href=\"https:\/\/bhergonomic.com\/es\/office-pod-compliance\/\">gu\u00eda de cumplimiento de office pod<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What B&amp;H Ergonomics Can and Cannot Confirm<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">B&amp;H Ergonomics can explain the selected pod&#8217;s construction, mobility, power method, ventilation, size, weight, installation, documentation, and available sprinkler provision. We can also respond to reviewer questions about the product and adjust the configuration when a suitable option is available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">B&amp;H Ergonomics cannot declare that a pod is permit-free nationwide, approve its location, design a building fire-protection system, issue a permit, or replace the local AHJ, landlord, building professionals, or licensed trades. A claim such as &#8220;it has wheels, so no permit is required&#8221; is too broad to use for a U.S. project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The cleanest decision record separates two responsibilities:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>B&amp;H Ergonomics confirms the product:<\/strong> selected model, configuration, dimensions, weight, power, ventilation, installation method, and available documents.<\/li>\n\n\n\n<li><strong>The local project team confirms the site:<\/strong> classification, placement, permits, sprinklers, egress, accessibility, electrical work, and required approvals.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Choose the Pod Configuration After the Initial Review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Complete the first review before locking the purchase order. At minimum, determine the required capacity, proposed location, plug-in or hardwired power, sprinkler provision, accessibility needs, and document requests.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once those conditions are clear, compare B&amp;H Ergonomics <a href=\"https:\/\/bhergonomic.com\/es\/office-pods\/\">m\u00f3dulos de oficina<\/a> by size, use case, configuration, and project requirements. This keeps product selection aligned with the building review instead of forcing the site to accept a configuration chosen too early.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Preguntas frecuentes<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-question-1786957835701\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\u00bfSe consideran los cub\u00edculos de oficina como muebles?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Se puede presentar para su revisi\u00f3n una peque\u00f1a cabina independiente, enchufable y con ruedas, como mobiliario m\u00f3vil. La clasificaci\u00f3n no es autom\u00e1tica. La autoridad local y el equipo de construcci\u00f3n deciden si el modelo, la instalaci\u00f3n y la ubicaci\u00f3n espec\u00edficos se consideran mobiliario, equipo o obra.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786957840607\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\u00bfSignifica que, al tener ruedas, un m\u00f3dulo de oficina no necesita un permiso?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Las ruedas facilitan la movilidad, pero no anulan las normas locales ni otros factores que requieran una revisi\u00f3n. Un m\u00f3dulo sobre ruedas a\u00fan puede requerir una revisi\u00f3n debido a la conexi\u00f3n el\u00e9ctrica fija, el tama\u00f1o, los rociadores, las salidas de emergencia, la accesibilidad, las condiciones del piso o las pol\u00edticas del edificio.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786957845275\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\u00bfSe necesita un permiso el\u00e9ctrico para instalar una cabina de oficina con conexi\u00f3n el\u00e9ctrica?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Una configuraci\u00f3n est\u00e1ndar con enchufes evita el trabajo de cableado directo en el edificio asociado con el cableado fijo, lo que puede simplificar la revisi\u00f3n. No obstante, siguen siendo aplicables las normas el\u00e9ctricas locales y las pol\u00edticas del edificio. Verifica la toma de corriente, el voltaje, el recorrido del cable, la documentaci\u00f3n del producto y cualquier requisito de inspecci\u00f3n para el sitio propuesto.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1786957850276\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\u00bfEs necesario que cada cub\u00edculo de oficina cerrado cuente con un rociador en su interior?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No universal rule applies to every U.S. pod installation. The answer depends on the pod, its ceiling and location, the building&#8217;s fire-protection system, local requirements, and the reviewing authority. Ask before ordering whether the project needs an internal sprinkler, a prepared sprinkler provision, another accepted configuration, or no pod-specific sprinkler work.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Quick Answer For many U.S. offices, a small freestanding pod with plug-in power and casters can be presented for review as movable furniture rather than a built room. That does not create an automatic permit exemption. The local Authority Having Jurisdiction (AHJ), landlord or building manager, and any required fire or electrical reviewer decide which [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7474,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[50],"tags":[73],"class_list":["post-7471","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-office-pod-resources","tag-office-pod"],"_links":{"self":[{"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/posts\/7471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/comments?post=7471"}],"version-history":[{"count":19,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/posts\/7471\/revisions"}],"predecessor-version":[{"id":8949,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/posts\/7471\/revisions\/8949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/media\/7474"}],"wp:attachment":[{"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/media?parent=7471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/categories?post=7471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bhergonomic.com\/es\/wp-json\/wp\/v2\/tags?post=7471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}