{"id":7846,"date":"2026-06-05T08:39:34","date_gmt":"2026-06-05T08:39:34","guid":{"rendered":"https:\/\/bhergonomic.com\/?p=7846"},"modified":"2026-08-27T07:27:00","modified_gmt":"2026-08-27T07:27:00","slug":"office-pod-lead-time","status":"publish","type":"post","link":"https:\/\/bhergonomic.com\/pt\/office-pod-lead-time\/","title":{"rendered":"Guia de prazos de entrega do Office Pod: Produ\u00e7\u00e3o, expedi\u00e7\u00e3o, entrega e configura\u00e7\u00e3o"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Resposta r\u00e1pida<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O prazo de entrega da c\u00e1psula para escrit\u00f3rio come\u00e7a normalmente ap\u00f3s a confirma\u00e7\u00e3o da encomenda e o dep\u00f3sito ser efectuado, e n\u00e3o quando \u00e9 solicitada a primeira cota\u00e7\u00e3o. Para muitas encomendas de B&amp;H Ergonomics com menos de 50 unidades, a produ\u00e7\u00e3o demora normalmente cerca de 25 dias. O prazo de entrega final depende do endere\u00e7o confirmado, do prazo de entrega, da rota de transporte, do acesso ao local e da sele\u00e7\u00e3o de um servi\u00e7o normal ou r\u00e1pido.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00daltima atualiza\u00e7\u00e3o: 5 de junho de 2026 | Autor: Richard | Tempo estimado de leitura: 11 minutos<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-1024x768.png\" alt=\"prazo de entrega do office pod\" class=\"wp-image-7849\" srcset=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-1024x768.png 1024w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-600x450.png 600w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-300x225.png 300w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-768x576.png 768w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline-16x12.png 16w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-lead-time-timeline.png 1448w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Resumo do prazo de entrega<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Est\u00e1gio<\/th><th>Tempo t\u00edpico<\/th><\/tr><\/thead><tbody><tr><td>Confirma\u00e7\u00e3o da encomenda e dep\u00f3sito<\/td><td>O prazo de entrega come\u00e7a aqui<\/td><\/tr><tr><td>Produ\u00e7\u00e3o<\/td><td>Cerca de 25 dias para muitas encomendas inferiores a 50 unidades<\/td><\/tr><tr><td>Cores exteriores\/interiores standard<\/td><td>Normalmente n\u00e3o h\u00e1 tempo de espera adicional<\/td><\/tr><tr><td>Cor exterior RAL separada<\/td><td>Cerca de +3 semanas<\/td><\/tr><tr><td>Expedi\u00e7\u00e3o DDP<\/td><td>Depende do endere\u00e7o final e da op\u00e7\u00e3o de entrega<\/td><\/tr><tr><td>Configura\u00e7\u00e3o<\/td><td>Depende do acesso ao local, da experi\u00eancia da equipa e do \u00e2mbito da instala\u00e7\u00e3o<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">O tempo de execu\u00e7\u00e3o do Office Pod n\u00e3o \u00e9 um n\u00famero<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Quando uma equipa de instala\u00e7\u00f5es pergunta \u201cQuanto tempo vai demorar a c\u00e1psula do escrit\u00f3rio?\u201d, a resposta n\u00e3o deve ser uma \u00fanica estimativa vaga.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Normalmente, separo o tempo de espera das c\u00e1psulas de escrit\u00f3rio em cinco partes:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Revis\u00e3o de or\u00e7amentos e aprova\u00e7\u00e3o interna<\/li>\n\n\n\n<li>Confirma\u00e7\u00e3o da encomenda e acordo de dep\u00f3sito<\/li>\n\n\n\n<li>Produ\u00e7\u00e3o e personaliza\u00e7\u00e3o<\/li>\n\n\n\n<li>Transporte de mercadorias, tratamento das importa\u00e7\u00f5es e entrega no destino<\/li>\n\n\n\n<li>Descarga, acesso ao edif\u00edcio, desloca\u00e7\u00e3o para o quarto final e montagem<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Esta sequ\u00eancia \u00e9 importante porque diferentes pessoas controlam diferentes partes da linha do tempo. O fabricante controla o planeamento da produ\u00e7\u00e3o e a embalagem. A rota de transporte controla o tempo de tr\u00e2nsito. O comprador controla frequentemente a rapidez com que a encomenda \u00e9 aprovada, a clareza com que o endere\u00e7o de entrega \u00e9 confirmado e se o edif\u00edcio est\u00e1 pronto quando a c\u00e1psula chega.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Se a sua equipa ainda estiver a comparar tipos de pods antes de confirmar um projeto, comece por uma abordagem mais abrangente <a href=\"https:\/\/bhergonomic.com\/pt\/guia-de-capsulas-para-escritorio\/\">guia de c\u00e1psulas para escrit\u00f3rio<\/a>. Este artigo centra-se no calend\u00e1rio ap\u00f3s a concretiza\u00e7\u00e3o do projeto.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Quando come\u00e7a efetivamente o tempo de espera do Office Pod?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O prazo de entrega da c\u00e1psula de escrit\u00f3rio deve normalmente ser contado a partir do momento em que a encomenda \u00e9 confirmada e o dep\u00f3sito \u00e9 efectuado.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">N\u00e3o deve ser contado a partir do primeiro pedido de informa\u00e7\u00e3o, do primeiro descarregamento do cat\u00e1logo ou da primeira estimativa informal. Um fornecedor pode discutir op\u00e7\u00f5es antes desse momento, mas a programa\u00e7\u00e3o da produ\u00e7\u00e3o, o planeamento de materiais, a confirma\u00e7\u00e3o de cores, a l\u00f3gica de embalagem e o planeamento do transporte necessitam de uma base de encomenda confirmada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este \u00e9 um dos problemas de calend\u00e1rio mais evit\u00e1veis na aquisi\u00e7\u00e3o de m\u00f3dulos de escrit\u00f3rio. Por vezes, um cliente passa muito tempo no processo de financiamento ou de aprova\u00e7\u00e3o e, mais tarde, precisa do m\u00f3dulo com urg\u00eancia. Nessa altura, o projeto pode necessitar de uma entrega acelerada e de um custo adicional de urg\u00eancia que poderia ter sido evitado com um dep\u00f3sito antecipado.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Etapa<\/th><th>O rel\u00f3gio do ciclo de produ\u00e7\u00e3o inicia-se?<\/th><th>Atraso controlado pelo comprador<\/th><th>Conselhos pr\u00e1ticos<\/th><\/tr><\/thead><tbody><tr><td>Pedido de or\u00e7amento inicial<\/td><td>N\u00e3o<\/td><td>Detalhes incompletos do modelo, cor, quantidade ou endere\u00e7o<\/td><td>Prepare com anteced\u00eancia o caso de utiliza\u00e7\u00e3o, a quantidade, o endere\u00e7o de entrega e o calend\u00e1rio preferido.<\/td><\/tr><tr><td>Revis\u00e3o de cota\u00e7\u00f5es<\/td><td>N\u00e3o<\/td><td>Aprova\u00e7\u00e3o interna lenta ou propriet\u00e1rio do or\u00e7amento pouco claro<\/td><td>Confirmar quem aprova a compra antes que o prazo se torne urgente.<\/td><\/tr><tr><td>Confirma\u00e7\u00e3o da encomenda<\/td><td>Quase<\/td><td>Altera\u00e7\u00f5es tardias das especifica\u00e7\u00f5es<\/td><td>Finalizar modelo, quantidade, cores, tamanho, prazo de entrega e destino.<\/td><\/tr><tr><td>Dep\u00f3sito efectuado<\/td><td>Sim<\/td><td>Atraso no pagamento do financiamento<\/td><td>Tratar a calendariza\u00e7\u00e3o dos dep\u00f3sitos como parte do calend\u00e1rio do projeto e n\u00e3o apenas como uma tarefa contabil\u00edstica.<\/td><\/tr><tr><td>Produ\u00e7\u00e3o programada<\/td><td>Sim<\/td><td>Altera\u00e7\u00f5es tardias de cor ou de endere\u00e7o<\/td><td>Manter est\u00e1vel a especifica\u00e7\u00e3o aprovada.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Para os gestores de instala\u00e7\u00f5es, equipas de compras e comerciantes, a pergunta mais \u00fatil n\u00e3o \u00e9 apenas \u201cQual \u00e9 o prazo de entrega do fornecedor?\u201d. \u00c9 tamb\u00e9m \u201cO que \u00e9 que temos de aprovar internamente para que esse prazo de entrega possa come\u00e7ar?\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tempo de produ\u00e7\u00e3o para encomendas padr\u00e3o de c\u00e1psulas de escrit\u00f3rio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Para muitas encomendas de c\u00e1psulas de escrit\u00f3rio B&amp;H Ergonomics com menos de 50 unidades, o ciclo de produ\u00e7\u00e3o comum \u00e9 de cerca de 25 dias ap\u00f3s a confirma\u00e7\u00e3o da encomenda e o acordo do dep\u00f3sito. O prazo de produ\u00e7\u00e3o final depende da quantidade da encomenda, das especifica\u00e7\u00f5es confirmadas e do calend\u00e1rio da f\u00e1brica no momento da encomenda.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Este calend\u00e1rio pode funcionar bem para projectos comerciais de pequena e m\u00e9dia dimens\u00e3o, porque as c\u00e1psulas s\u00e3o fabricadas como uma ordem de produ\u00e7\u00e3o planeada, e n\u00e3o como um projeto de constru\u00e7\u00e3o constru\u00eddo de raiz no local. A chave \u00e9 confirmar a encomenda de forma clara antes de a produ\u00e7\u00e3o ser programada.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para o planeamento standard B&amp;H atual, estas op\u00e7\u00f5es normalmente n\u00e3o aumentam o tempo de produ\u00e7\u00e3o:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Escolha da especifica\u00e7\u00e3o<\/th><th>Impacto t\u00edpico dos prazos de entrega<\/th><\/tr><\/thead><tbody><tr><td>Cor standard da moldura exterior da gama comum de 8 cores<\/td><td>Sem tempo de espera adicional<\/td><\/tr><tr><td>Cor interior da gama comum de 48 cores<\/td><td>Sem tempo de espera adicional<\/td><\/tr><tr><td>Tamanho personalizado dentro da capacidade de produ\u00e7\u00e3o confirmada<\/td><td>Nenhum prazo de entrega adicional quando aprovado antes de a encomenda ser finalizada<\/td><\/tr><tr><td>Prepara\u00e7\u00e3o standard em flat-pack<\/td><td>Integrado no planeamento normal da produ\u00e7\u00e3o e da embalagem<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A frase importante \u00e9 \u201caprovado antes de a encomenda ser finalizada\u201d. Se o comprador alterar uma especifica\u00e7\u00e3o ap\u00f3s o in\u00edcio do planeamento da produ\u00e7\u00e3o, o calend\u00e1rio pode mudar, mesmo que essa escolha n\u00e3o acrescente normalmente tempo.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Como \u00e9 que as cores exteriores RAL personalizadas afectam o tempo de execu\u00e7\u00e3o<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A cor personalizada \u00e9 muitas vezes f\u00e1cil de discutir e f\u00e1cil de subestimar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">O B&amp;H Ergonomics pode suportar o planeamento de cores exteriores personalizadas, mas nem todos os pedidos de cores se comportam da mesma forma na produ\u00e7\u00e3o. A gama de cores padr\u00e3o da moldura exterior e a gama de cores padr\u00e3o do interior geralmente n\u00e3o adicionam tempo de espera. Uma cor de moldura exterior RAL separada pode acrescentar cerca de tr\u00eas semanas ao calend\u00e1rio.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Tamb\u00e9m pode haver um custo de instala\u00e7\u00e3o. Para a atual l\u00f3gica de or\u00e7amenta\u00e7\u00e3o B&amp;H, uma cor exterior RAL separada pode acrescentar um custo adicional de $500 quando a encomenda tem menos de tr\u00eas unidades nessa cor. Quando uma \u00fanica cor excede tr\u00eas unidades, essa taxa de configura\u00e7\u00e3o de cor extra normalmente n\u00e3o \u00e9 necess\u00e1ria.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Requisito de cor<\/th><th class=\"has-text-align-right\" data-align=\"right\">Impacto dos prazos de entrega<\/th><th class=\"has-text-align-right\" data-align=\"right\">Impacto nos custos<\/th><th>Nota de planeamento<\/th><\/tr><\/thead><tbody><tr><td>Cor exterior padr\u00e3o<\/td><td class=\"has-text-align-right\" data-align=\"right\">Sem tempo de espera adicional<\/td><td class=\"has-text-align-right\" data-align=\"right\">Sem taxa de configura\u00e7\u00e3o de cor especial<\/td><td>Ideal para projectos padr\u00e3o mais r\u00e1pidos.<\/td><\/tr><tr><td>Cor interior standard<\/td><td class=\"has-text-align-right\" data-align=\"right\">Sem tempo de espera adicional<\/td><td class=\"has-text-align-right\" data-align=\"right\">Sem taxa de configura\u00e7\u00e3o de cor especial<\/td><td>\u00datil para combinar com o estilo do escrit\u00f3rio sem atrasar a produ\u00e7\u00e3o.<\/td><\/tr><tr><td>Cor exterior RAL separada, menos de 3 unidades por cor<\/td><td class=\"has-text-align-right\" data-align=\"right\">Cerca de +3 semanas<\/td><td class=\"has-text-align-right\" data-align=\"right\">Extra $500<\/td><td>Confirme com anteced\u00eancia para evitar altera\u00e7\u00f5es inesperadas no calend\u00e1rio e no or\u00e7amento.<\/td><\/tr><tr><td>Cor exterior RAL separada, mais de 3 unidades numa s\u00f3 cor<\/td><td class=\"has-text-align-right\" data-align=\"right\">Cerca de +3 semanas<\/td><td class=\"has-text-align-right\" data-align=\"right\">Normalmente n\u00e3o h\u00e1 taxa de configura\u00e7\u00e3o de cor extra<\/td><td>Melhor para projectos com v\u00e1rias unidades de marca.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Para designers e comerciantes de escrit\u00f3rios, eu confirmaria a paleta de cores antes da ordem de compra. Uma decis\u00e3o tardia sobre a cor RAL pode criar um atraso que nada tem a ver com a capacidade de fabrico ou a velocidade de expedi\u00e7\u00e3o.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O tempo de envio depende do endere\u00e7o de entrega final<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O tempo de envio \u00e9 espec\u00edfico para cada endere\u00e7o. O pa\u00eds de destino, a cidade, o c\u00f3digo postal, a rota portu\u00e1ria, a disponibilidade de frete, o fluxo alfandeg\u00e1rio, as condi\u00e7\u00f5es locais de entrega e o compromisso de entrega afectam o hor\u00e1rio final.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Por exemplo, se o destino for Seattle, WA 98108, um plano de entrega \u00e0 porta DDP mar\u00edtimo normal pode demorar cerca de 35-38 dias. Um servi\u00e7o de entrega r\u00e1pida pode demorar cerca de 22-25 dias. Este \u00e9 apenas um exemplo de destino e n\u00e3o uma afirma\u00e7\u00e3o de que Seattle \u00e9 o local de entrega mais comum.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Exemplo Apenas destino<\/th><th class=\"has-text-align-right\" data-align=\"right\">Op\u00e7\u00e3o de entrega<\/th><th class=\"has-text-align-right\" data-align=\"right\">Tempo estimado de tr\u00e2nsito<\/th><th>O que significa<\/th><\/tr><\/thead><tbody><tr><td>Seattle, WA 98108<\/td><td class=\"has-text-align-right\" data-align=\"right\">Entrega normal por porta DDP mar\u00edtima<\/td><td class=\"has-text-align-right\" data-align=\"right\">Cerca de 35-38 dias<\/td><td>\u00datil para o planeamento com custos controlados quando o calend\u00e1rio n\u00e3o \u00e9 urgente.<\/td><\/tr><tr><td>Seattle, WA 98108<\/td><td class=\"has-text-align-right\" data-align=\"right\">Servi\u00e7o r\u00e1pido<\/td><td class=\"has-text-align-right\" data-align=\"right\">Cerca de 22-25 dias<\/td><td>\u00datil quando o prazo \u00e9 apertado, mas o comprador deve contar com um custo adicional.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A pergunta certa para o seu projeto \u00e9: \u201cQual \u00e9 o prazo de entrega estimado para o nosso endere\u00e7o exato, de acordo com o prazo de entrega selecionado?\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Uma estimativa de frete sem um endere\u00e7o final \u00e9 apenas uma faixa de planejamento. Use a <a href=\"https:\/\/bhergonomic.com\/pt\/office-pod-delivery-checklist\/\">lista de verifica\u00e7\u00e3o de entrega de pods de escrit\u00f3rio para gestores de instala\u00e7\u00f5es<\/a> antes de solicitar um prazo real de entrega do pod de escrit\u00f3rio e forne\u00e7a o endere\u00e7o de destino, o tipo de edif\u00edcio, as condi\u00e7\u00f5es de descarga, as restri\u00e7\u00f5es de acesso e o prazo-alvo o mais cedo poss\u00edvel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">O que inclui a entrega de c\u00e1psulas DDP Office<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A DDP \u00e9 importante porque muitos compradores de c\u00e1psulas para escrit\u00f3rio n\u00e3o efectuam regularmente opera\u00e7\u00f5es de importa\u00e7\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para encomendas B&amp;H Ergonomics DDP, o pre\u00e7o DDP cotado destina-se a cobrir o \u00e2mbito de entrega acordado com base no endere\u00e7o confirmado, nas condi\u00e7\u00f5es de entrega e nos detalhes do projeto. Quaisquer servi\u00e7os adicionais, tais como a desloca\u00e7\u00e3o do andar superior, o transporte interno do edif\u00edcio, a coloca\u00e7\u00e3o final da sala ou a instala\u00e7\u00e3o, devem ser cotados separadamente.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esta \u00e9 uma das principais raz\u00f5es pelas quais alguns clientes preferem a DDP. Torna o custo de importa\u00e7\u00e3o mais claro para o aprovisionamento, as finan\u00e7as e a aprova\u00e7\u00e3o do projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A ICC explica as regras Incoterms como termos comerciais utilizados para definir as responsabilidades do comprador e do vendedor na entrega internacional. Para obter informa\u00e7\u00f5es gerais sobre o DAP e o DDP, a ICC Academy's <a href=\"https:\/\/academy.iccwbo.org\/incoterms\/article\/incoterms-2020-dap-or-ddp\/\" rel=\"noopener\">Explica\u00e7\u00e3o dos Incoterms 2020 DAP ou DDP<\/a> \u00e9 uma refer\u00eancia \u00fatil. Para qualquer projeto espec\u00edfico, o contrato e o or\u00e7amento devem ainda definir o \u00e2mbito real.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para projectos de c\u00e1psulas de escrit\u00f3rio B&amp;H, os compradores devem ler atentamente o DDP no or\u00e7amento:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>\u00c2mbito de entrega<\/th><th>DDP t\u00edpico do B&amp;H Significado<\/th><\/tr><\/thead><tbody><tr><td>Entrega no endere\u00e7o indicado<\/td><td>Inclu\u00eddo quando o endere\u00e7o \u00e9 confirmado na cota\u00e7\u00e3o DDP<\/td><\/tr><tr><td>Direitos de importa\u00e7\u00e3o e tratamento aduaneiro no \u00e2mbito da DDP acordada<\/td><td>Inclu\u00eddo no pre\u00e7o DDP do contrato<\/td><\/tr><tr><td>Descarga<\/td><td>Inclu\u00eddos quando claramente confirmados no acordo de entrega acordado<\/td><\/tr><tr><td>Mudar a c\u00e1psula para cima<\/td><td>N\u00e3o inclu\u00eddo por defeito<\/td><\/tr><tr><td>Movimento da sala final no interior do edif\u00edcio<\/td><td>N\u00e3o inclu\u00eddo por defeito, exceto se especificamente acordado<\/td><\/tr><tr><td>Montagem ou instala\u00e7\u00e3o local<\/td><td>N\u00e3o inclu\u00eddo pela DDP, exceto se claramente indicado como um servi\u00e7o separado<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Esta distin\u00e7\u00e3o evita um dos mal-entendidos mais comuns: A entrega de portas DDP n\u00e3o \u00e9 a mesma coisa que a coloca\u00e7\u00e3o de portas no andar de cima e a instala\u00e7\u00e3o na sala final.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Dia da entrega: Descarga, acesso ao edif\u00edcio e desloca\u00e7\u00e3o para o andar de cima<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O plano de entrega deve separar tr\u00eas momentos:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>O pod chega ao endere\u00e7o especificado.<\/li>\n\n\n\n<li>As mercadorias s\u00e3o descarregadas.<\/li>\n\n\n\n<li>Os componentes deslocam-se atrav\u00e9s do edif\u00edcio at\u00e9 \u00e0 localiza\u00e7\u00e3o final.<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Para encomendas B&amp;H DDP em que o or\u00e7amento confirma a descarga, a entrega no endere\u00e7o especificado e a descarga est\u00e3o inclu\u00eddas no acordo de entrega acordado. A desloca\u00e7\u00e3o dos componentes para cima ou atrav\u00e9s do edif\u00edcio n\u00e3o est\u00e1 inclu\u00edda por defeito.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Isso n\u00e3o significa que o projeto seja dif\u00edcil. Significa que o comprador deve planear a parte da constru\u00e7\u00e3o antes da chegada do cami\u00e3o.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilize esta lista de controlo antes de confirmar a entrega:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Item de entrega<\/th><th>O que confirmar<\/th><\/tr><\/thead><tbody><tr><td>Endere\u00e7o<\/td><td>Endere\u00e7o comercial completo, pessoa de contacto, n\u00famero de telefone e hor\u00e1rio de entrega<\/td><\/tr><tr><td>Zona de carga<\/td><td>Acesso de cami\u00f5es, zona de descarga, altura das docas, restri\u00e7\u00f5es de estacionamento<\/td><\/tr><tr><td>Entrada do edif\u00edcio<\/td><td>Largura da porta, largura do corredor, pontos de viragem e processo de seguran\u00e7a<\/td><\/tr><tr><td>Elevador<\/td><td>Dimens\u00e3o interior, abertura da porta, limite de peso, necessidade de reserva<\/td><\/tr><tr><td>N\u00edvel do ch\u00e3o<\/td><td>Se os componentes do casulo devem deslocar-se para cima ou atrav\u00e9s de um longo percurso interno<\/td><\/tr><tr><td>Responsabilidade de gest\u00e3o<\/td><td>Quem desloca os componentes ap\u00f3s a descarga<\/td><\/tr><tr><td>Responsabilidade de instala\u00e7\u00e3o<\/td><td>Auto-montagem, coordena\u00e7\u00e3o local do instalador apoiado pelo B&amp;H ou equipa de terceiros<\/td><\/tr><tr><td>Prepara\u00e7\u00e3o do s\u00edtio<\/td><td>Localiza\u00e7\u00e3o da eletricidade, coloca\u00e7\u00e3o final, estado do pavimento e \u00e1rea de trabalho segura<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A diretiva da OSHA <a href=\"https:\/\/www.osha.gov\/trucking-industry\/loading-unloading\" rel=\"noopener\">guia de carga e descarga<\/a> e <a href=\"https:\/\/www.osha.gov\/Publications\/OSHA2236.pdf\" rel=\"noopener\">publica\u00e7\u00e3o sobre movimenta\u00e7\u00e3o e armazenagem de materiais<\/a> s\u00e3o refer\u00eancias de seguran\u00e7a \u00fateis para as equipas das instala\u00e7\u00f5es que analisam os riscos de cami\u00f5es, docas e manuseamento. N\u00e3o substituem o processo de seguran\u00e7a do seu edif\u00edcio, mas mostram porque \u00e9 que a descarga e o manuseamento interno devem ser tratados como uma tarefa planeada.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img decoding=\"async\" width=\"683\" height=\"1024\" src=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-683x1024.png\" alt=\"entrega de c\u00e1psulas de escrit\u00f3rio\" class=\"wp-image-7856\" srcset=\"https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-683x1024.png 683w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-600x900.png 600w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-200x300.png 200w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-768x1152.png 768w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery-8x12.png 8w, https:\/\/bhergonomic.com\/wp-content\/uploads\/2026\/06\/office-pod-delivery.png 1024w\" sizes=\"(max-width: 683px) 100vw, 683px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Tempo de prepara\u00e7\u00e3o: Refer\u00eancia de f\u00e1brica vs Planeamento real no local de trabalho<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O Elite-S \u00e9 um exemplo \u00fatil, uma vez que o produto foi concebido para uma montagem r\u00e1pida em embalagens planas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Nas condi\u00e7\u00f5es de refer\u00eancia da f\u00e1brica B&amp;H, tr\u00eas trabalhadores qualificados podem montar a estrutura Elite-S em cerca de 7-8 minutos, excluindo a descarga, a desembalagem, os movimentos internos, a prepara\u00e7\u00e3o do local e as verifica\u00e7\u00f5es finais.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Esse tempo \u00e9 uma refer\u00eancia de f\u00e1brica. N\u00e3o \u00e9 uma promessa de que todos os locais de trabalho terminar\u00e3o todo o processo de rece\u00e7\u00e3o, desembalagem, movimenta\u00e7\u00e3o e configura\u00e7\u00e3o final no mesmo tempo.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Deve ser separado um tempo realista de instala\u00e7\u00e3o do m\u00f3dulo de escrit\u00f3rio:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tarefa<\/th><th>O que afecta o tempo<\/th><\/tr><\/thead><tbody><tr><td>Descarga<\/td><td>Acesso dos cami\u00f5es, estado das paletes, configura\u00e7\u00e3o das docas, regras do local<\/td><\/tr><tr><td>Movimento interno<\/td><td>Elevador, corredor, espa\u00e7o livre na porta, n\u00edvel do piso, m\u00e3o de obra<\/td><\/tr><tr><td>Desembalagem<\/td><td>Prote\u00e7\u00e3o de embalagens, espa\u00e7o de prepara\u00e7\u00e3o, tratamento de res\u00edduos<\/td><\/tr><tr><td>Montagem<\/td><td>Modelo, experi\u00eancia da equipa, ferramentas, n\u00edvel do pavimento<\/td><\/tr><tr><td>Controlos finais<\/td><td>Alinhamento das portas, energia, ventila\u00e7\u00e3o, ilumina\u00e7\u00e3o, limpeza<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A refer\u00eancia de montagem Elite-S continua a ser valiosa. Diz ao comprador que o produto em si foi concebido para uma montagem eficiente quando o local est\u00e1 preparado e a equipa conhece o processo. Mas, para o planeamento do projeto, eu nunca ignoraria a desembalagem, o percurso dos movimentos, o acesso ao edif\u00edcio e as regras locais do local.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para um fluxo de trabalho de prepara\u00e7\u00e3o do s\u00edtio mais aprofundado, utilize o B&amp;H <a href=\"https:\/\/bhergonomic.com\/pt\/lista-de-verificacao-da-instalacao-da-cabina-telefonica-de-escritorio\/\">lista de verifica\u00e7\u00e3o da instala\u00e7\u00e3o da cabina telef\u00f3nica de escrit\u00f3rio<\/a> depois de a encomenda estar em curso.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Planeador do calend\u00e1rio do aprovisionamento at\u00e9 \u00e0 entrega<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Um calend\u00e1rio de projeto de c\u00e1psulas de escrit\u00f3rio forte combina ac\u00e7\u00f5es do comprador e ac\u00e7\u00f5es do fornecedor. Este \u00e9 o quadro de planeamento que eu utilizaria antes de aprovar um prazo.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Est\u00e1gio<\/th><th>L\u00f3gica de temporiza\u00e7\u00e3o t\u00edpica<\/th><th>Quem o controla<\/th><th>O que pode atras\u00e1-lo<\/th><th>A\u00e7\u00e3o do comprador<\/th><\/tr><\/thead><tbody><tr><td>Pedido de or\u00e7amento<\/td><td>Antes do in\u00edcio do prazo de entrega<\/td><td>Comprador e fornecedor<\/td><td>Modelo, quantidade, endere\u00e7o, cor ou prazo em falta<\/td><td>Envie os detalhes completos do projeto com anteced\u00eancia.<\/td><\/tr><tr><td>Aprova\u00e7\u00e3o interna<\/td><td>Antes do in\u00edcio do prazo de entrega<\/td><td>Comprador<\/td><td>Finan\u00e7as, or\u00e7amento, aquisi\u00e7\u00f5es ou atraso das partes interessadas<\/td><td>Definir um prazo de aprova\u00e7\u00e3o interna.<\/td><\/tr><tr><td>Confirma\u00e7\u00e3o da encomenda e dep\u00f3sito<\/td><td>O prazo de entrega come\u00e7a aqui<\/td><td>Comprador<\/td><td>Acordo de dep\u00f3sito lento<\/td><td>Tratar os prazos de pagamento como cr\u00edticos para o calend\u00e1rio.<\/td><\/tr><tr><td>Produ\u00e7\u00e3o<\/td><td>Normalmente, cerca de 25 dias para muitas encomendas inferiores a 50 unidades<\/td><td>B&amp;H Ergonomia<\/td><td>Altera\u00e7\u00f5es tardias das especifica\u00e7\u00f5es ou cor RAL especial<\/td><td>Aprovar o modelo, o tamanho e as cores antes da produ\u00e7\u00e3o.<\/td><\/tr><tr><td>Cor padr\u00e3o\/tamanho personalizado<\/td><td>Normalmente n\u00e3o h\u00e1 tempo de espera adicional quando a confirma\u00e7\u00e3o \u00e9 feita com anteced\u00eancia<\/td><td>Comprador e B&amp;H Ergonomics<\/td><td>Altera\u00e7\u00f5es tardias ap\u00f3s a confirma\u00e7\u00e3o<\/td><td>Bloquear as especifica\u00e7\u00f5es antes da liberta\u00e7\u00e3o da encomenda.<\/td><\/tr><tr><td>Cor exterior RAL separada<\/td><td>Cerca de +3 semanas<\/td><td>Comprador e B&amp;H Ergonomics<\/td><td>Aprova\u00e7\u00e3o tardia da cor ou lote pequeno de cores<\/td><td>Confirmar o custo e o calend\u00e1rio antes da aprova\u00e7\u00e3o do pedido de compra.<\/td><\/tr><tr><td>DDP entrega de carga e destino<\/td><td>Espec\u00edfico do endere\u00e7o<\/td><td>Plano de itiner\u00e1rio e entrega de mercadorias<\/td><td>Endere\u00e7o incompleto ou condi\u00e7\u00f5es de descarga pouco claras<\/td><td>Confirmar o endere\u00e7o exato e o acesso ao local.<\/td><\/tr><tr><td>Servi\u00e7o r\u00e1pido<\/td><td>Acelera\u00e7\u00e3o paga facultativa<\/td><td>Disponibilidade do comprador e do frete<\/td><td>A aprova\u00e7\u00e3o tardia cria urg\u00eancia<\/td><td>Solicite um pre\u00e7o acelerado antes que o prazo se torne cr\u00edtico.<\/td><\/tr><tr><td>Configura\u00e7\u00e3o<\/td><td>Espec\u00edfico do local<\/td><td>Comprador, equipa de instala\u00e7\u00f5es, instalador<\/td><td>Via de acesso deficiente ou sala n\u00e3o preparada<\/td><td>Medir o percurso e planear a movimenta\u00e7\u00e3o antes da chegada.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Este quadro \u00e9 tamb\u00e9m uma boa forma de explicar o risco de calend\u00e1rio \u00e0s finan\u00e7as. A forma mais econ\u00f3mica de proteger o prazo n\u00e3o \u00e9, muitas vezes, um transporte mais r\u00e1pido. \u00c9 uma aprova\u00e7\u00e3o interna mais r\u00e1pida.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Erros comuns que as equipas das instala\u00e7\u00f5es cometem em termos de prazos de entrega<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 1: Contar o tempo de execu\u00e7\u00e3o a partir do primeiro or\u00e7amento<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A discuss\u00e3o de um or\u00e7amento pode ocorrer muito antes do in\u00edcio do planeamento da produ\u00e7\u00e3o. Conte o calend\u00e1rio do projeto a partir da confirma\u00e7\u00e3o da encomenda e do acordo de dep\u00f3sito se quiser um calend\u00e1rio realista.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 2: Tratar o tempo de expedi\u00e7\u00e3o como tempo total de execu\u00e7\u00e3o<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">O tempo de expedi\u00e7\u00e3o \u00e9 apenas uma parte do projeto. A produ\u00e7\u00e3o, a embalagem, o transporte, a entrega no destino, o movimento interno e a configura\u00e7\u00e3o fazem parte do cronograma.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 3: Assumir que a DDP significa direitos de importa\u00e7\u00e3o adicionais mais tarde<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Para encomendas DDP B&amp;H, o pre\u00e7o DDP cotado \u00e9 concebido em fun\u00e7\u00e3o do \u00e2mbito de entrega acordado, do endere\u00e7o confirmado e dos detalhes do projeto. Os compradores sem experi\u00eancia de importa\u00e7\u00e3o preocupam-se frequentemente com o facto de os direitos surgirem mais tarde. Com uma encomenda DDP devidamente confirmada, essa incerteza \u00e9 exatamente o que o prazo de entrega pretende reduzir.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 4: Assumir que o DDP inclui o movimento no andar de cima<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A entrega da DDP no endere\u00e7o especificado e a descarga n\u00e3o devem ser confundidas com a desloca\u00e7\u00e3o do produto para cima, atrav\u00e9s do edif\u00edcio ou para a sala final. Confirmar essa responsabilidade com anteced\u00eancia.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 5: Esperar demasiado tempo e depois pagar pela entrega acelerada<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Um processo financeiro lento pode transformar um projeto normal num projeto urgente. Se a data de abertura do escrit\u00f3rio estiver fixada, organize a aprova\u00e7\u00e3o interna e o prazo de dep\u00f3sito com anteced\u00eancia suficiente para evitar custos desnecess\u00e1rios de expedi\u00e7\u00e3o.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Erro 6: Mudar as cores depois de o programa ter sido criado<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">As cores padr\u00e3o s\u00e3o normalmente mais f\u00e1ceis de planear. Uma cor exterior RAL separada pode aumentar o tempo e, por vezes, o custo. Confirme as decis\u00f5es relativas \u00e0 cor da marca antes de a encomenda ser efectuada.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Porque \u00e9 que o B&amp;H Ergonomics pode reduzir a incerteza da linha de tempo<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">O B&amp;H Ergonomics pode ajudar os compradores a reduzir a incerteza do calend\u00e1rio porque o projeto \u00e9 tratado mais perto da fonte: produ\u00e7\u00e3o direta da f\u00e1brica, prepara\u00e7\u00e3o de embalagens planas, suporte de cores personalizadas, planeamento de entrega global e op\u00e7\u00f5es DDP para muitos destinos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A vantagem pr\u00e1tica n\u00e3o \u00e9 apenas o pre\u00e7o. \u00c9 a clareza dos hor\u00e1rios.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Uma boa conversa com o comprador deve responder:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Quando \u00e9 que come\u00e7a o prazo de entrega?<\/li>\n\n\n\n<li>Qual \u00e9 o ciclo de produ\u00e7\u00e3o para esta quantidade?<\/li>\n\n\n\n<li>As cores ou altera\u00e7\u00f5es de tamanho solicitadas afectam a produ\u00e7\u00e3o?<\/li>\n\n\n\n<li>Qual \u00e9 o prazo de entrega estimado da DDP para o endere\u00e7o exato?<\/li>\n\n\n\n<li>O que est\u00e1 inclu\u00eddo na DDP e o que n\u00e3o est\u00e1?<\/li>\n\n\n\n<li>Quem se encarrega da desloca\u00e7\u00e3o do andar de cima ou da coloca\u00e7\u00e3o do quarto final?<\/li>\n\n\n\n<li>\u00c9 necess\u00e1ria uma entrega acelerada ou o calend\u00e1rio normal pode funcionar?<\/li>\n\n\n\n<li>Como \u00e9 que a equipa deve comparar o custo de expedi\u00e7\u00e3o e o prazo de entrega das c\u00e1psulas?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Se a sua equipa est\u00e1 a escolher entre cabinas para uma pessoa, c\u00e1psulas de trabalho e espa\u00e7os de reuni\u00e3o maiores, compare as principais <a href=\"https:\/\/bhergonomic.com\/pt\/office-pods\/\">c\u00e1psulas de escrit\u00f3rio<\/a> primeiro, depois pe\u00e7a \u00e0 B&amp;H Ergonomics um or\u00e7amento espec\u00edfico para o projeto com os prazos de produ\u00e7\u00e3o e de entrega separados.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Solicitar um prazo de execu\u00e7\u00e3o espec\u00edfico do projeto<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Precisa de um prazo de entrega espec\u00edfico para um projeto? Envie ao B&amp;H Ergonomics o seu modelo, quantidade, prefer\u00eancia de cor, endere\u00e7o de entrega, data de chegada prevista e se necessita de entrega DDP ou coordena\u00e7\u00e3o do instalador.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A nossa equipa pode separar o tempo de produ\u00e7\u00e3o, o tempo de entrega da c\u00e1psula do escrit\u00f3rio, as considera\u00e7\u00f5es sobre os custos de envio, o \u00e2mbito da descarga e os pressupostos de configura\u00e7\u00e3o com base nos detalhes do seu projeto.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para obter uma estimativa \u00fatil, enviar:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>modelo ou caso de utiliza\u00e7\u00e3o<\/li>\n\n\n\n<li>quantidade<\/li>\n\n\n\n<li>cores exteriores e interiores preferidas<\/li>\n\n\n\n<li>se \u00e9 necess\u00e1ria uma cor exterior RAL separada<\/li>\n\n\n\n<li>pedido de tamanho personalizado, se for caso disso<\/li>\n\n\n\n<li>endere\u00e7o de entrega final<\/li>\n\n\n\n<li>data prevista de chegada<\/li>\n\n\n\n<li>se a DDP \u00e9 prefer\u00edvel<\/li>\n\n\n\n<li>condi\u00e7\u00f5es de descarga<\/li>\n\n\n\n<li>informa\u00e7\u00f5es sobre o n\u00edvel do piso e o elevador<\/li>\n\n\n\n<li>se \u00e9 necess\u00e1ria a coordena\u00e7\u00e3o do instalador<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Quanto mais completa for esta informa\u00e7\u00e3o, menor ser\u00e1 a probabilidade de o projeto necessitar de revis\u00f5es de or\u00e7amentos, de taxas de urg\u00eancia evit\u00e1veis ou de surpresas no dia da entrega.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-question-1784092705806\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Quanto tempo demora a produ\u00e7\u00e3o de uma c\u00e1psula de escrit\u00f3rio?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Para muitas encomendas de c\u00e1psulas de escrit\u00f3rio B&amp;H Ergonomics com menos de 50 unidades, a produ\u00e7\u00e3o demora normalmente cerca de 25 dias ap\u00f3s a confirma\u00e7\u00e3o da encomenda e o dep\u00f3sito ser efectuado. O prazo exato deve ser confirmado no or\u00e7amento porque a quantidade, as especifica\u00e7\u00f5es, o calend\u00e1rio de produ\u00e7\u00e3o e os requisitos de entrega podem alterar o prazo do projeto.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1784092710582\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">A cor personalizada aumenta o prazo de entrega das c\u00e1psulas para escrit\u00f3rio?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>As cores padr\u00e3o da moldura exterior B&amp;H e as cores interiores normalmente n\u00e3o aumentam o prazo de entrega. Uma cor de moldura exterior RAL separada pode acrescentar cerca de tr\u00eas semanas. Para a l\u00f3gica atual de cota\u00e7\u00e3o B&amp;H, uma cor RAL separada abaixo de tr\u00eas unidades pode tamb\u00e9m adicionar uma taxa de configura\u00e7\u00e3o $500, enquanto que mais de tr\u00eas unidades numa cor evita normalmente essa taxa extra.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1784092716097\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">A entrega da c\u00e1psula DDP inclui os direitos de importa\u00e7\u00e3o?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Para encomendas B&amp;H Ergonomics DDP, o pre\u00e7o DDP cotado destina-se a cobrir o \u00e2mbito de entrega acordado com base no endere\u00e7o confirmado, nas condi\u00e7\u00f5es de entrega e nos detalhes do projeto. O comprador n\u00e3o deve ver encargos ocultos de direitos de importa\u00e7\u00e3o mais tarde, quando esse \u00e2mbito for devidamente confirmado. Qualquer servi\u00e7o adicional deve ser or\u00e7amentado separadamente.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1784092721204\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">O DDP inclui a mudan\u00e7a da c\u00e1psula do escrit\u00f3rio para o andar de cima?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>N\u00e3o, n\u00e3o por defeito. A entrega B&amp;H DDP pode incluir a entrega na morada especificada e a descarga, quando confirmada no or\u00e7amento, mas n\u00e3o inclui automaticamente a desloca\u00e7\u00e3o para o andar de cima, o transporte interno do edif\u00edcio, a coloca\u00e7\u00e3o final na sala ou a instala\u00e7\u00e3o, a menos que esses servi\u00e7os sejam confirmados separadamente.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1784092727264\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Com que rapidez \u00e9 que o Elite-S pode ser montado?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Nas condi\u00e7\u00f5es de refer\u00eancia da f\u00e1brica B&amp;H, tr\u00eas trabalhadores qualificados podem montar a estrutura Elite-S em cerca de 7-8 minutos, excluindo a descarga, a desembalagem, os movimentos internos, a prepara\u00e7\u00e3o do local e as verifica\u00e7\u00f5es finais. Para projectos de escrit\u00f3rios reais, os compradores devem planear todo o processo de rece\u00e7\u00e3o e montagem, e n\u00e3o apenas o tempo de montagem da estrutura.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Quick Answer Office pod lead time usually starts after the order is confirmed and the deposit is arranged, not when the first quote is requested. For many B&amp;H Ergonomics orders under 50 units, production is commonly about 25 days. Final delivery time depends on the confirmed address, delivery term, freight route, site access, and whether [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7849,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"disabled","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[50],"tags":[73],"class_list":["post-7846","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-office-pod-resources","tag-office-pod"],"_links":{"self":[{"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/posts\/7846","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/comments?post=7846"}],"version-history":[{"count":19,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/posts\/7846\/revisions"}],"predecessor-version":[{"id":9031,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/posts\/7846\/revisions\/9031"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/media\/7849"}],"wp:attachment":[{"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/media?parent=7846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/categories?post=7846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bhergonomic.com\/pt\/wp-json\/wp\/v2\/tags?post=7846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}