Office Relocation Checklist: From Lease Notice to Your First Week in the New Office

An office relocation checklist works when every task has an owner and a clear finish line. Start with the three dates that take longest to confirm: the notice period and hand-back terms in your current lease, building approval and fit-out at the new space, and installation of the new internet line. Turn each one into a deadline counted back from your move date; whichever deadline comes first is when planning has to start. Then run the move in six phases: decide and plan, prepare the new office, inventory and tell people, move week, hand back the old office, and the first week. If one team is moving within the same building, use the short checklist further down.

Last Updated: November 4, 2026 | Author: Richard | Estimated Reading Time: 13 minutes

Start with the three longest lead times

These three dates are set by other parties, so a bigger moving crew cannot shorten them. Get each one in writing before you choose a move date.

Lead timeWho confirms itWhat to ask for
Lease notice and hand-backLandlord or managing agent, checked against your leaseThe last date to serve notice, the lease end date, and the condition the space must be returned in: removal of fixtures, repairs, redecoration, cleaning
Approval and fit-out at the new spaceBuilding management and your fit-out contractorHow long building approval takes, the works schedule, and the date the space is handed over ready for furniture and IT
New internet lineYour carrier or internet providerThe installation date, whether it is confirmed or estimated, and whether it depends on cabling or entry work inside the building

Then turn each lead time into a deadline counted back from move day. An example with illustrative inputs, not typical values: you plan to move two weeks before the lease ends, and the lease requires six months’ notice, about 26 weeks, so notice is due about 24 weeks before move day. Building approval takes four weeks, the works take ten, and you want two weeks of testing before staff arrive, so the approval application has to go in 16 weeks before move day, with the new lease signed and the fit-out design ready by then. The carrier quotes ten weeks for a new line; with the same testing buffer, the order has to be placed 12 weeks before move day. The notice deadline comes first, so planning starts about 24 weeks before move day. By then you need the decision to move and, if you will not serve notice until the new lease is signed, the new lease as well.

If any of the three dates is only an estimate, that is the date to chase. A carrier date that depends on work inside the building also depends on building approval for that work.

Office relocation checklist

Office relocation checklist by phase

Name one move lead before anything else: a person who can decide on budget, dates and trade-offs, and who owns this list. Each task below names the role that should own it. In a small company one person may hold several roles, but every task still needs a name next to it.

1. Decide and plan

TaskOwnerDone when
Name the move lead and an owner for facilities, IT, people and financeLeadershipEach workstream has one named person
Confirm the notice date, lease end date and hand-back obligationsMove lead with finance or legalDates and obligations are written into the move plan
Get the three long lead times in writingMove leadLandlord, building and carrier dates are on file
Set the budget, including the old officeFinanceBudget covers reinstatement, disposal, movers, new purchases and a contingency line
Choose the move date around business-critical datesMove lead with department headsDate agreed, with no month-end close, launch or audit in move week
Plan headcount and layout for the new spaceFacilitiesEvery person and team has a place on the approved layout

2. Prepare the new office

TaskOwnerDone when
Submit building approvals and start fit-outFacilities with contractorApproval received and works schedule signed
Order the internet line, cabling and Wi-FiITInstallation date confirmed in writing; every data outlet tested
Order furniture, pods and equipment with long delivery timesFacilitiesDelivery date falls after fit-out completes and before move day
Check power and data at every desk, meeting room and booth locationFacilities with ITEach location on the layout has been checked on site
Set up access control and keysFacilitiesBadges and keys tested for every user group
Agree the defect list with the contractorFacilitiesEach defect has a fix date before move day

3. Inventory and tell people

TaskOwnerDone when
Inventory every asset and tag it move, stay or disposeFacilities with ITEvery item has a tag and a destination room
Tell employees the date, new address, commute options and packing dutiesHR or people teamMessage sent, with one person named to answer questions
Notify clients, suppliers, banks, insurers and registration bodiesFinance with office managerContact list completed and address change dates set
Schedule address changes on the website, business listings, invoices and email signaturesMarketing with office managerChanges scheduled for move day
Book movers and walk both buildings with themMove leadMover has seen the route, loading areas and elevators at both sites, and their insurance cover has been checked against the value of what they will carry
Book loading docks and service elevators at both buildingsFacilitiesWritten booking from both buildings, with any certificate of insurance they require accepted

4. Move week and move day

TaskOwnerDone when
Issue labels that match room numbers on the new layoutOffice managerEvery box and item label matches a room on the plan
Back up data, shut down and label equipmentITBackup verified before shutdown; cables bagged and labeled
Set a packing deadline for desks and shared areasDepartment headsDesks and storage cleared by the deadline
Put one supervisor at each building on move dayMove leadTwo named people, each with the other’s and the mover’s phone numbers
Check items off the inventory as they arriveFacilitiesEvery tag accounted for; damage photographed and logged
Run the day-one IT test before staff arriveITEvery item on the day-one list passes

5. Hand back the old office

TaskOwnerDone when
Remove disposed items and complete reinstatementFacilitiesSpace matches the condition the lease requires
Wipe devices leaving the businessITSanitization record kept for each device
Cancel or transfer utilities, internet and other servicesFinance with ITEach end date confirmed in writing
Walk through with the landlord and return keysMove leadHandover note signed or confirmed by email, with photos kept
Set up mail forwardingOffice managerForwarding active from move day

6. First week in the new office

TaskOwnerDone when
Brief everyone on fire exits, the assembly point and first-aid locationsFacilitiesBriefing given on the first day; emergency contact list updated for the new address
Open a single issue list and review it dailyFacilitiesEach issue has an owner and a fix date
Check every meeting room, booth and pod for power, ventilation, lighting and door operationFacilitiesEach space checked and logged
Confirm old-office services have stopped billingFinanceNo charges after the confirmed end dates
Update the floor plan and asset registerFacilitiesRegister shows each asset’s new location
Collect staff feedback at the end of the first weekHR or people teamIssues sorted into fix now and review later

Some problems only show up with regular use, such as meeting rooms that are always booked or desk zones that are too noisy. Those need a few weeks of evidence, and a post-occupancy evaluation is the method for them once the first-week fixes are closed.

Short checklist for a small or same-building move

If one team is moving to another floor or a smaller suite in the same building, with no new internet line and no fit-out, this list covers most of the work:

  • Confirm with building management that the new space is available on your date, and book the service elevator.
  • Check the lease or license for both spaces: notice, hand-back condition and dates.
  • Name one person in charge and one IT contact.
  • Check power and network points at each new desk.
  • Decide what moves, what stays and what is disposed of.
  • Tell the team the date, new location and packing deadline.
  • Label boxes and furniture with room numbers from the new floor plan.
  • Back up data and label equipment before shutdown.
  • Test connectivity, printers and meeting room equipment before people arrive.
  • Check every item off the inventory as it arrives.
  • Show the team the fire exits and assembly point for the new floor.
  • Clean and photograph the old space before handing it back.
  • Keep one issue list for the first week.

Decide what moves, what stays and what goes

Make this decision per asset type before you ask movers for quotes, because the answer changes the size of the move.

AssetUsual outcomeCheck before deciding
Desks and chairsMove if they fit the new layoutDimensions against the new plan, condition, and the cost to move compared with replacing
Filing and storageReduce before movingRecord retention rules; what can be scanned or archived offsite
Computers, screens and phonesMoveAge and warranty; devices leaving the business need wiping
Servers and network equipmentPlan with IT, not with the movers aloneDowntime window; racks and power at the new site
Built-in partitions, glass rooms and kitchensStay or are removed under the leaseWhat the lease says about fixtures and reinstatement
Freestanding office pods and phone boothsMoveRoute, flooring, glass handling and power at both sites
Kitchen appliances, plants and artworkMove, donate or disposeWho owns them and who removes them

Where the right outcome is unclear, compare the cost of moving, repairing and replacing each item. Our guide to keeping, repairing, relocating or replacing office assets walks through that comparison.

Office pods and phone booths

Office pods from B&H Ergonomics are freestanding and modular, with plug-in power and their own ventilation. They are not built into the space, so they can move with you. How they move depends on the route:

  • Same floor, short distance, hard level floor: B&H Ergonomics single-person phone booths have heavy-duty casters and can be rolled a short distance on a hard, level surface. Do not roll a booth across long-fiber carpet.
  • Another floor or another building: plan for disassembly and reassembly. Glass panels, door alignment, seals and power connections all have to go back together correctly.

B&H Ergonomics provides the installation manual and video guidance for its pods. Get both before the move and give them to the team that will take the pods apart and put them back together. The office phone booth relocation guide covers dismantling, packing and post-move checks step by step.

At the new office, confirm a power outlet, door swing clearance and free space around the ventilation openings at each pod location before move day. If you are buying new pods for the new space, schedule delivery after fit-out finishes and before staff arrive.

IT cutover: test before people arrive

Do not let the first employees to log in be the people who test the network. Write a day-one list and have IT run it between move day and the first working day in the new office:

  • The internet line is live and delivering the services you ordered.
  • Wi-Fi covers every desk area, meeting room and booth.
  • Phones work, including the main number and call forwarding.
  • Printers are connected and printing.
  • Meeting room screens and video conferencing work.
  • Badges and door access work for every user group.
  • Alarm monitoring and security services have the new address.

Keep the old internet line running until the new one has passed a full working day. Canceling the old contract on move day leaves you with no fallback if the new line is late.

Decide the fallback before move day, too. If the new line is not live, staff can stay at the old office, work remotely for the day, or use mobile hotspots for essential work. The move lead makes that call, so agree in advance which option applies.

Computers, phones, printers and copiers that store data, and storage drives that are leaving the business, need wiping before they are sold, recycled or returned at lease end. NIST’s media sanitization guideline, SP 800-88 Rev. 2, published in September 2025, explains how to set up a sanitization program and choose a method based on the sensitivity of the data. If a disposal vendor does the work, ask for a record for each device that includes its serial number.

Decommission and hand back the old office

Office decommissioning means returning the old space in the condition the lease requires and closing everything tied to that address. The order matters, because each step leaves the space ready for the next:

  1. Agree the reinstatement scope with the landlord in writing: which fixtures, partitions and cabling must be removed, and what condition the space must be returned in.
  2. Clear everything tagged dispose, and keep receipts for items sold, donated or recycled.
  3. Complete the reinstatement works and repairs.
  4. Book the final clean for after the last contractor leaves.
  5. Walk through with the landlord or agent, photograph every room and keep the photos with the handover note. They are your record if the security deposit or restoration charges are disputed.
  6. Return all keys and badges, and ask building management to deactivate the badges.

Set the end dates for utilities, cleaning, security monitoring and waste collection after the walkthrough, not on move day, because contractors and cleaners still need power, water and access. Return leased equipment such as copiers once their storage has been wiped. Destroy paper records you no longer need to keep, and keep mail forwarding running until clients and suppliers have the new address.

FAQ

How far in advance should you plan an office relocation?

Work out three deadlines counted back from your move date: the last day to serve notice under your current lease, the day building approval for the new space must be applied for, and the day the new internet line must be ordered, each allowing time to test IT before people arrive. Planning starts at whichever deadline comes first. A move within the same building that needs no new line and no fit-out can usually be planned in weeks rather than months.

Who should manage an office move?

One move lead who can decide on budget, dates and trade-offs, supported by named owners for facilities, IT, people and finance. Decisions on move day, such as whether staff open the new office when the internet line is late, need one person with the authority to make them.

Can office pods be moved to a new office?

Yes, if they are freestanding modular pods. A B&H Ergonomics single-person phone booth can be rolled on its casters for a short move across a hard, level floor; a move to another floor or building needs disassembly and reassembly using the B&H installation manual and video guidance.

Picture of Richard Chen

Richard Chen

Richard Chen is an Engineer and Sales Support/Marketing Manager at Space Oasis.

Request Your Office Pod Quote

Trade & volume pricing available

Ordering 5+? Tell us how many below.